Case Study
Percunos, LLC
True Oil - North Dakota
Pole-mounted device installed on existing tower facilities
Property: Hagen & Redwing Creek Unit Tank Battery Facilities
Protection: CMCE-55 devices installed on existing tower facilities
Device Specs: 6 inches wide x 8 inches high, 5.2 lbs, coverage radius of 55 meters/180 feet
ZERO lightning strikes since 2020 with CMCE devices installed in strategic locations
Installation Details Two (2) CMCE-55 Lightning Suppression Devices installed on existing tower facilities. CMCE units were installed at the top of the tank batteries and connected into existing grounding loop with a braided grounding cable via mechanical connection.
Want to know more? Let's talk about solutions. Contact us at 832-838-4485 or 888-878-4589 or email info@percunos.com